Master this deck with 20 terms through effective study methods.
Generated from uploaded pdf
Adjusts contract sum based on actual work done.
Ensures fair payment to contractors.
Occurs when actual quantities differ from estimates.
Measurements must be accurate and verifiable.
Verify completed work physically on site.
Includes direct measurement and calculation method.
Bills of Quantities and site measurement records.
Payment is based on measured quantities.
Re-measurement adjusts for actual quantities; lump sum does not.
Structures used for living accommodation.
Designed for business and public use.
Used for manufacturing and production activities.
Buildings for public and social services.
Constructed for unique functions.
Projects related to movement of people and goods.
Involves water supply, storage, and control.
Protect the environment and public health.
Construction of large load-bearing structures.
Focus on soil and foundation engineering.
Building works focus on shelter; civil works on infrastructure.